Dillinger steel supports the load-bearing structure of this master work which perfectly combines avant-garde design and durability. read more...
Innovative, lean, sustainable and cost-effective... DIWETEN 460+M makes it possible! read more...
Dillinger steel lets office workers climb on windows... read more...
A high stressed section of the German highway A6 becomes more efficient and safer thanks to Dillinger steel read more...
Steel bridges replace concrete bridges read more...
The buildings built in the Emirate of Dubai are taking on dimensions that are exceeding the imaginations of many Europeans. The last one on the list: The Address Sky View skyscraper complex, inaugurated at the end of 2019. read more...
The new headquarters of the French daily newspaper Le Monde officially opens today. The building provides Paris with a new architectural highlight. Steel from Dillinger plays a key “supporting role” in the structure. read more...
Revision of parts 2 to 6 of the standard "Hot rolled products of structural steels": EN 10025-2 to -6 read more...
The new Moselle Bridge in the Bernkastel-Wittlich district (Rhineland Palatinate, Germany) will open to public traffic on 21 November. Dillinger played a major role, with more than 25,000 tonnes of heavy plate used in construction of the bridge spanning the Moselle river. read more...
DIWETEN 460 M/ML, the Dillinger weathering steel - one step ahead of the norm read more...
Two new projects built with Dillinger heavy plates read more...
Innovative top-quality steel products, total orientation around our customers' needs and unceasing technological development in close cooperation with our partners form the basis of our success - as they have for more than 333 years.
© 2016 Dillinger All rights reserved.
AG der Dillinger Hüttenwerke
Werkstraße 1
66763 Dillingen/Saar
Tel.: +49 6831 47 0
Fax: +49 6831 47 2212
E-Mail: info@dillinger.biz
Imprint
Data privacy statement
T&C